A break on the sensors is planned to group 1 from 20h to 8h daily. We do not want that Switch B pauses. In the settings of switch B The legacy of the group is disabled Schedule = always Dependency type = select an object Dependence = Ping Switch A Despite this configuration switch B had paused. How to Switch B that does not go into break?
Dependence of equipment in a group
Modified on 2025-06-10 13:54:45 +0200
Attention: This article is a record of a conversation with the Paessler support team. The information in this conversation is not updated to preserve the historical record. As a result, some of the information or recommendations in this conversation might be out of date.
Disclaimer:
The information in the Paessler Knowledge Base comes without warranty of any kind. Use at your own risk. Before applying any instructions please exercise proper system administrator housekeeping. You must make sure that a proper backup of all your data is available.
The information in the Paessler Knowledge Base comes without warranty of any kind. Use at your own risk. Before applying any instructions please exercise proper system administrator housekeeping. You must make sure that a proper backup of all your data is available.
When a group is paused all of the devices underneath are paused whether they inherit the schedule or not. If you want that device to not be included in the schedule I would multi-edit the sensors in that group to have that schedule leaving out that device so that this isn't set at the group level.
Feb, 2014 - Permalink